CNC Thread Inspection: GO/NO-GO, Thread Depth and Acceptance

CNC Thread Inspection: GO/NO-GO, Thread Depth and Acceptance

For CNC thread inspection, agree the thread standard and tolerance class, the GO/NO-GO criterion, usable depth and any separate dimensional checks before production. The report should identify the features checked, the gauges used and whether inspection took place before or after finishing.

A screw may turn into a tapped hole even when the thread falls outside its specified limits. It may also stop short of the engagement the assembly needs. A useful acceptance plan checks the thread requirement and the usable depth, then keeps any assembly trial as a separate result.

Start with the thread requirement, then choose the gauge

The gauge must match the specified thread system, size, pitch and tolerance class. Internal threads generally use thread plug gauges; external threads use thread ring gauges. OSG’s gauge guide distinguishes these types and shows why deep or recessed threads can require different access arrangements.

Identify the applicable gauging standard and revision in the inspection agreement. ISO 1502 covers gauging for ISO general-purpose metric threads. ASME B1.2 addresses gauges and gauging for Unified inch threads. A familiar nominal size does not make gauges from different thread systems interchangeable.

This guide concerns ordinary machined fastening threads. Pipe threads, insert-receiving threads and other special forms require their own review. If the drawing leaves the thread definition open, resolve it before ordering gauges. Our lista de comprobación DFM para CNC explains what belongs in the original hole and thread callout.

Thread plug gauge beside a machined metal block with an internal thread

Understand what a GO/NO-GO result covers

A matched thread limit-gauge set gives a pass/fail result against defined limits, rather than an actual measured value for every dimension. The GO member must pass through the required threaded length under the prescribed procedure. The NO-GO member checks the opposite acceptance limit, with entry judged by the applicable rules. Use both members as specified.

Avoid a purchase note that says only “NO-GO must not enter.” The permitted entry and method depend on the applicable thread and gauging rules. Agree the criterion rather than borrowing a number of turns from a different thread system. Do not force a gauge to obtain a pass.

Buyer’s questionEvidence to agreeWhat that result leaves open
Does the thread meet the specified limit-gauge acceptance?Correct GO/NO-GO set, applicable criterion and recorded result.Usable depth, separately controlled diameters, location and joint performance.
Is the required full-thread depth available?A defined thread-depth measurement or suitable depth-gauging arrangement.Total drilled depth and the remaining material below the hole.
Is the internal minor diameter acceptable?A suitable separate diameter check against the specified limits.Acceptance of the other thread characteristics.
Will the specified screw and mating part assemble?An agreed assembly trial with identified mating components.Full dimensional conformity or load capacity beyond the trial.
Is the threaded hole in the correct position?Inspection against the drawing’s location requirements and datums.Thread-size acceptance.

Check usable depth without confusing it with hole depth

For a blind hole, decide how the inspector will establish the end of the required full thread. A gauge reaching into the hole does not, by itself, document that distance. Its entry geometry, reach and reference surface must suit the feature.

A dedicated thread-depth gauge can combine thread gauging with depth measurement. EMUGE’s thread-depth plug gauge is one example. Select the gauge for the hole geometry and required measurement range.

Specify the reference face and the depth to be checked. If a counterbore or recess sits above the thread, show where the usable-thread requirement begins. Confirm that the gauge can reach the feature without its handle or shoulder interfering. Keep the drilled-depth check separate when that dimension is also controlled.

Cutaway concept of a blind threaded hole with a drill-point bottom

Include the dimensions a thread gauge does not settle

For an internal thread, plan the minor-diameter check separately from the thread plug-gauge result. OSG’s gauge catalogue distinguishes plain plug gauges for internal minor diameter from thread plug gauges. Choose equipment suitable for the actual diameter, access and tolerance.

The inspection plan should also address any specified thread location, orientation, entry chamfer or surrounding geometry. A limit gauge passing through the thread does not establish the hole’s position relative to a mounting face. Likewise, a satisfactory dimensional result does not establish stripping strength, tightening torque or fatigue life. Request separate tests when those properties are part of the product requirement.

Inspect in the agreed finished condition

Make clear whether the acceptance requirement applies before or after coating, plating or another secondary operation. If the drawing requires the delivered thread to meet the final limits, retain evidence from that condition. An earlier machining check cannot establish what happened during later processing.

Show masked or uncoated threads on the drawing and agree the inspection sequence with the supplier. If a finished thread fails, investigate before approving rework. Re-tapping can remove material or coating, so it should not be treated as an automatic remedy.

Finished metal components with threaded holes on a workbench

Make supplier and receiving checks comparable

Use the same released requirement at both ends of the order. Check gauge identification, specification, condition and calibration status before comparing results. Clean the part and gauge as required by the inspection procedure. Johnson Gage’s internal inspection guidance explicitly addresses clean parts and gauging elements, along with verification of comparator settings.

If the supplier records a pass and receiving inspection records a failure, hold the affected parts while the methods are compared. Establish whether both teams checked the same revision, feature, delivered condition and acceptance criterion. Review gauge access and condition before deciding the thread must be changed.

A useful thread-inspection record includes:

  • Part number, drawing revision, lot and feature identifier.
  • Thread requirement and applicable acceptance criterion.
  • Gauge identification and calibration status.
  • Inspection stage, including whether finishing was complete.
  • GO/NO-GO result and separately required depth or diameter results.
  • Quantity inspected, sampling agreement and any nonconformance disposition.

Agree the reporting detail and inspection quantity for the order. A note saying “threads checked” leaves the receiving inspector guessing whether it covers one sample or the whole lot. The guía de inspección del primer artículo explains how individual results fit into a broader production-release decision.

Inspection records beside trays of machined threaded components

Agree thread acceptance with the CNC quotation

Zenbot’s oferta de mecanizado CNC asks buyers to identify standard thread callouts and required gauges. Send the current model and drawing, the finished-condition requirement, the critical threaded features and the inspection records you need. Flag blind or recessed holes that may be difficult to gauge.

Ask the reviewer to confirm the proposed gauging method, any separate depth or diameter checks, and the inspection scope before the order is released. Include that agreement with the released drawing so receiving inspection can use the same criteria.

Preguntas frecuentes

1. Can a standard screw replace a thread GO/NO-GO gauge?

A screw can support an assembly trial with the specified mating parts. Its fit alone does not establish conformity to the thread’s dimensional limits. Use the agreed gauging method when dimensional acceptance is required.

2. Must the NO-GO thread gauge never enter the hole?

Do not apply that rule universally. Use the entry criterion and procedure required by the applicable thread and gauging standard. Confirm them with the supplier before inspection.

3. Does a GO thread plug gauge verify usable thread depth?

Not automatically. Define how depth will be measured from the specified reference surface. A suitable thread-depth gauge or another agreed arrangement can provide that evidence.

4. Does a thread plug gauge check the internal minor diameter?

Plan a separate minor-diameter check rather than treating the thread plug-gauge pass as complete evidence. The method must suit the bore, access and specified limits.

5. Should threads be inspected before or after anodizing?

Follow the drawing’s required condition. In-process checks can help control machining, but a final thread requirement needs evidence after the operations that may affect it. Agree masking and the inspection sequence in advance.

6. Does a GO/NO-GO pass prove the thread can carry the required load?

No. Dimensional gauging does not establish the joint’s strength or service life. Define any required torque, pull-out, stripping or durability tests separately.

7. What should happen if the buyer’s and supplier’s gauges disagree?

Hold the affected parts and compare the thread requirement, gauge specification and condition, calibration status, cleaning, method and inspection stage. Resolve the difference before approving rework or accepting the lot.

8. Does a thread inspection report mean every part was checked?

Only if the agreed scope and report say so. State the lot, inspected quantity, sampling basis or 100% inspection requirement, and the features covered.

Zenbot China logo

Acerca del equipo de Zenbot

El equipo de Zenbot elabora recursos sobre fabricación y compras para Zenbot China. Nuestras guías abarcan mecanizado CNC, fabricación de chapa metálica, impresión 3D, moldeo por inyección, PCBA y preparación de solicitudes de presupuesto, y ayudan a los equipos de ingeniería y compras a comparar opciones y definir los requisitos del proyecto. La viabilidad técnica, las especificaciones, los precios y los plazos de entrega requieren confirmación para cada proyecto.