CNC Design Checklist
Reduce unnecessary setups and machining time while keeping critical features inspectable.
Choose a process to review production options, design guidance and finishing routes.
Choose a process to review production options, design guidance and finishing routes.
Practical design checks, process comparisons and RFQ guidance for CNC machining, sheet metal, 3D printing, injection molding, PCB assembly and complete product builds.
Use these resources to prepare designs, compare manufacturing routes and organize the information required for a faster engineering review.
Check walls, radii, bends, draft, holes, threads, clearances and assembly interfaces before release.
View DFM quick guides P/SCompare manufacturing routes by material, volume, geometry, finish, tolerance and tooling needs.
Use the selector M/FReview common metals, polymers, PCB constructions and finishing routes across Zenbot services.
Explore capabilities RFQPrepare CAD, drawings, quantities, materials, finishes, inspection needs and target dates.
Build the file package QADefine critical features, inspection methods, reports, samples and functional test coverage.
Plan acceptance FAQAnswers to common questions about files, process choice, tolerances, prototypes and production.
Read common questionsSix practical checklists aligned with Zenbot's core manufacturing services.
Reduce unnecessary setups and machining time while keeping critical features inspectable.
Prepare flat patterns and formed parts with practical bend, hole and hardware decisions.
Choose an additive route based on visual detail, strength, size, material and production intent.
Design for reliable filling, cooling and ejection before prototype or production tooling begins.
Align fabrication, sourcing, assembly, inspection and test around one controlled data package.
Coordinate mechanical parts, electronics, purchased items and test requirements as one product.
Browse selected published guides by purchasing question and manufacturing process. Use them to prepare files, compare routes and plan acceptance before requesting a quote.
Prepare controlled files, quantities, materials, finishes and acceptance requirements.
Read the guidePlan the dimensions, evidence and acceptance checks needed before production approval.
Read the guideCheck Gerber, BOM, placement data, assembly instructions and test requirements.
Read the guideCoordinate interfaces, file revisions, inspection and responsibilities across a product build.
Read the guideReview V-scoring, tab routing, panel rails and handling with the PCB fabrication and assembly plan.
Read the PCB panelization guideCompare PCB surface finishes against component footprints, storage, assembly and inspection requirements.
Compare ENIG and lead-free HASLCompare named resin grades using heat, impact, appearance and validation requirements for the housing.
Compare ABS and PC/ABSCompare prototype processes by test objective, material, geometry and critical dimensions.
Read the guideReview corners, thin walls, deep holes and threads before machining.
Read the guideCompare alloy requirements for strength, machining, finishing and the intended application.
Read the guideChoose a machining route around rotational features, geometry and workholding.
Read the guideReview bends, hole placement, hardware and assembly access.
Read the guideCompare enclosure manufacturing routes around geometry, interfaces and quantity.
Read the guideDefine the finish around appearance, protection and functional interfaces.
Read the guideReview wall thickness, draft, ribs and gate location before tooling.
Read the guideCheck the profile, alloy, die constraints and secondary operations.
Read the guideA headline tolerance or unit price is not enough. Use geometry, material, quantity, finish and validation needs together.
| Process | Best for | Tooling | Prototype | Production |
|---|---|---|---|---|
| CNC Machining | Tight features, metals and engineering plastics | Fixtures / cutters | Strong fit | Strong fit |
| Sheet Metal | Enclosures, brackets, panels and welded assemblies | Bend tooling | Strong fit | Strong fit |
| 3D Printing | Complex geometry, fast iterations and no-tooling parts | None | Strong fit | Case review |
| Injection Molding | Repeat plastic parts with stable geometry and resin | Mold required | Bridge route | Strong fit |
| PCB & PCBA | Fabricated boards, sourced components and assembly | Stencil / fixtures | Strong fit | Strong fit |
| Casting / Extrusion | Special quantity, profile or material requirements | Pattern / die | Case review | Confirm |
Use different resources and evidence at concept, prototype, validation and production stages.
Clarify product intent and shortlist practical routes.
Learn quickly from physical parts and assemblies.
Verify materials, interfaces, function and acceptance.
Control repeatability, supply, packaging and changes.
The most useful RFQ describes the part, the product and the acceptance criteria—not just a file and quantity.
A clear inspection plan connects the drawing, process risk and product function. Confirm what is measured, how it is measured and what records are required.
Use these answers to prepare the first review. Project-specific details are confirmed after Zenbot receives the files.
For mechanical parts, send 3D CAD plus a 2D drawing where tolerances, threads, finishes or inspection notes matter. For PCB assembly, include Gerber data, BOM, placement data, stack-up requirements and test information.
Yes. Share the end use, material requirements, quantity, target date, finish and critical features. Engineering can then compare feasible routes instead of relying on a process name alone.
No. Apply tolerances according to function and identify the truly critical features. Over-tolerancing can increase manufacturing and inspection cost without improving the product.
Yes. A multi-process package can be reviewed around the complete product. Include a controlled BOM, interface requirements, assembly instructions, test criteria and packaging needs.
No. They are planning resources. Final manufacturability, tolerance, material, finish, inspection scope, schedule and commercial terms are confirmed only after project review.
Send your controlled product data and project requirements. Zenbot will review process fit, manufacturing risks and the information needed to proceed.
A complete package supports a clearer response and reduces avoidable follow-up.